Selfbild yourself

If you want to selfbild, to do inexperience as for yourself does not "All construction"
The qualification and the experience are necessary for constructing, the foundation work, electricity, and water service, etc.
Therefore, these construction will be requested from the professional.

As for self build, "Piling of the log and interior of carpenter and painting, etc," becomes the main work" It is costliest to the construction of this part.

  1. Self buildI is not confident one for the first time, though you to build log house.
  2. There are no people with you. Good construction pro of the foundation work and electrical work, etc, do not understand.
  3. Physical strength is not confident and the height is scary one.
  4. You want to build even only the outside of quickly time.
  5. Do enjoy finishing up for yourself.

    We shall assist to you. Please consult to me. Spending time with people,it is low cost, and safety,early.

The photos was useing the many sites.
The "kit" arrived. Transship from the container to the track with crane, to the deposit postion.

* Notes: Do set 2-3 lumbers are horizontally put. Do cover of rain and moisture are done in the seat.
It piles up from the number 1 log.

* Notees: Open hole of first log, then foundation to fixes. Underly to the asphalt-seet on the foundtion bace.
The intersection part puts out the right angle accurately the horizontal of the log.
Antisepsis of base log is processed.
The log can be piled up by the hand, the yunicc car and the crane are used, it is efficient. It puts up scaffolding according to height.

* Notees:@When you pile up the log by 3-4 steps, put in pegs.
If there are twist and warp, the planed log, the corrects it, by bar and hand winch, and jack.
The roof boad is constructed as early as possible. Completion of roof work as possible.

* Notees:@When you was install fittings such as windows and doors, the indoor work can be done even on the day of rain. It is safty for prevention.
The indoor work, fixtures are installed first. The space of 5-7cm is opened to the upper part of the window and the door. Pack the insulator into the space. In door pinting is only a dirty floor and other parts.

* Notees:@The window and the door because with of the glass is heavy, with carefully. Insulator in the back of the ceiling and the below the floor borad.
Finish work is stairs. The stairs are half-finished products only of assembling the pieces. Good design,good sense.

If the outside wall can be painted, it is completion. Please satisfy the smell of a pleasant tree.
You can feel insulate good capabilly.


HOME Recommend self build